Sacramento, California (555) 042-2200
GANTRYConstruction Co. Start a project

Home / Services / Preconstruction

Service 01

Preconstruction

Preconstruction is where projects are actually won or lost. We price early, publish our assumptions, and update the number at every design milestone, so the budget you finance is the budget we build.

The live cost model

Most GCs hand you a number and defend it. We hand you a model and maintain it. Within three weeks of engagement you get a concept-level budget built from our own cost history, not a square-foot guess from a national database. That model is re-priced at schematic design, 50 percent design development, and 90 percent construction documents, with every movement between milestones logged and explained line by line. If steel moved, you will see steel move, and you will see it the week it moved.

Constructability, in writing

Every drawing set gets a documented constructability review: envelope details that will not survive the field, structural collisions, sequences that fight each other, and long-lead equipment hiding on a finish schedule. On our last five projects those reviews averaged 34 logged items per design phase. Each one is tracked to resolution in the same ledger the owner reads. Figures illustrative, method real.

Procurement strategy

We buy the job the way it should be built, not the way the bid calendar suggests. Long-lead items (switchgear, elevators, air handlers, storefront) get released early against budget allowances. Trade packages are scoped to eliminate gaps and overlaps, and our bid leveling sheets go to the owner unedited: who bid, what they included, what they excluded, and why we recommend who we recommend.

What it costs

For owners who contract our construction services, preconstruction is typically priced as a fixed fee credited against the construction contract. You are never paying twice for the same estimate.

Service title blockSVC-01
Best forOwners validating a pro forma
Typical contractFixed fee, credited at award
Point of contactMaria Voss
Figures illustrative. Fictional demo company.

Or call the desk directly: (555) 042-2200

Deliverables

What lands on your desk, and when.

DeliverableWhenFormat
Concept budgetWeek 3Cost model, basis-of-estimate memo
Milestone re-pricingSD, 50% DD, 90% CDVariance ledger, line-item detail
Constructability reviewsEach design phaseLogged items, tracked to resolution
Master scheduleFrom SD onwardMilestone ledger with float report
Bid levelingBuyoutUnedited leveling sheets, award memos

Illustrative deliverables schedule, fictional demo.

Start a project

Have a project going to bid?

Send the drawings, the napkin sketch, or just the pro forma. You will have a real conversation with our preconstruction team within two business days, and a concept budget within three weeks.

Start a project Subcontractors: get prequalified (555) 042-2200 Preconstruction desk, Monday to Friday. Fictional demo, form responses are simulated.