Kilnworks Retail Hall

A 1946 brick kiln warehouse retrofitted into a nine-suite food hall in twelve months.

West Sacramento, CA28,500 SFGeneral Contracting2025
Kilnworks Retail Hall, a restored 1946 brick warehouse with new black steel windows and a lit courtyard at dusk
GC-2404 Kilnworks Retail Hall, West Sacramento Illustrative render
Project title block No. GC-2404
LocationWest Sacramento, CA
MarketRetail & Restaurant
Area28,500 SF
Delivery methodGeneral Contracting
ArchitectAperture West (fictional)
Duration12 months
Program9 tenant suites
Completion2025
StatusComplete
Self-perform scopesSelective demolition, doors/frames/hardware
Issued for: portfolio demoFigures illustrative. Fictional demo company.

The brief

A 1946 brick kiln warehouse with good bones and eighty years of undocumented modifications, bought by an owner who wanted a nine-suite food hall without losing the building's character or a second construction season.

The build

Selective demolition ran with our own crews, opening the structure carefully enough to keep what mattered: the sawtooth roof, the kiln brick, the crane rail that now carries light fixtures. Structural retrofit added steel moment frames threaded through existing masonry, sequenced bay by bay so the roof never came off. Nine restaurant-grade suites meant nine hood runs and a shared grease infrastructure, coordinated as one system rather than nine change orders.

The numbers

Twelve months, door to door. Eight of nine suites were leased before substantial completion, and the ninth signed within sixty days, which the owner attributes partly to being able to walk tenants through a construction site that never looked out of control. Figures illustrative: fictional demo project.

12Months, permit to open
9Restaurant-grade suites
8Suites leased before completion

Figures illustrative. Fictional demo company.

Start a project

Have a project going to bid?

Send the drawings, the napkin sketch, or just the pro forma. You will have a real conversation with our preconstruction team within two business days, and a concept budget within three weeks.